Wow, I really wasn't expecting to see this much done today. They were able to replace the rotting waterlogged wood on the edge of the tub and floor. They also replaced the pipes in the basement and brought them up to what would be code if Clinton had a code. They also put in the new tub. At this rate I am hoping that they are done by Friday. We currently have to shower in the basement, brush teeth in the kitchen and apply makeup or shave in the bedroom. The shower in the basement is very small, with no water pressure. I wouldn't want to have to use this shower for the rest of my life, but knowing that it is temporary and will lead to a better bathroom makes it worth while. I really think that the only one enjoying showering in the basement is Kristen. Of course she is the smallest and is not having a problem with the size or height of the shower. Kurt has to kneal down just to get under the shower so that he can wash his hair. Check tomorrow for more updates.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment